Platform Trades Tools Resources Consulting Portal
MODES
Vernier Estimating Platform  ·  14 Modes

14 Modes. One Platform.
Every Bid Covered.

Each mode is purpose-built for a specific stage of the construction lifecycle — from first napkin sketch to final payment app. Pick the mode. Upload your docs. Get results in minutes.

All 14 Modes

Choose Your Mode.
Vernier Does the Rest.

Every mode outputs trade-calibrated deliverables with complete pricing so you always have a range to present.

A
Full Bid Package
The complete deliverable. Vernier runs a full takeoff, generates your bill of materials, builds bid options including alternates, deducts, and value engineering, then layers on a construction schedule and risk register. This is the package you hand to the owner.
What You Get
  • Quantified takeoff & BOM
  • Complete proposal with scope narratives
  • Alternates, deducts & VE options
  • Construction schedule
  • Risk register with mitigation notes
When to Use   You're bidding a project and need the full package.
B
Budget / ROM
A rough order of magnitude estimate built on documented assumptions and key cost drivers. Fast enough for a same-day answer, defensible enough to put on letterhead. Includes an assumptions matrix so the owner knows exactly what's in and what's out.
What You Get
  • ROM cost range (low / mid / high)
  • Key cost driver breakdown
  • Assumptions matrix
  • Budget-grade exclusions list
When to Use   Owner asks "what would this cost?" and you need a fast answer.
C
Scope Development
Turns early-stage conversations into structured scope documents before drawings are complete. Generates a scope narrative, explicit exclusions list, and a budget range letter suitable for owner presentation.
What You Get
  • Scope narrative document
  • Exclusions & clarifications list
  • Budget range letter
  • Phasing recommendations
When to Use   Early-stage conversations before drawings are complete.
D
Plan Review
A three-pass analysis of your plans and specs: spec extraction, page-by-page review, then compilation. Flags NEC and IBC code compliance issues, surfaces RFI candidates before you even start estimating, and identifies value engineering opportunities.
What You Get
  • NEC / IBC code compliance report
  • RFI candidate list with references
  • VE opportunity flags
  • Spec extraction summary
  • Page-by-page findings log
When to Use   You have plans and specs and need them reviewed before bidding.
E
VE Analysis
Identifies value engineering opportunities across your scope and builds owner-ready pitch language for each one. Includes delta costs so the owner can see exactly how much each substitution or redesign saves.
What You Get
  • VE opportunity matrix
  • Delta cost per item
  • Owner-ready pitch language
  • Risk / quality impact notes
When to Use   You want to offer cost-saving alternatives.
F
Sub Leveling
Takes multiple subcontractor bids and normalizes them into a comparison matrix. Adjusts totals for scope gaps, identifies missing coverage areas, and generates an award recommendation with supporting rationale.
What You Get
  • Bid comparison matrix
  • Adjusted totals with scope gaps flagged
  • Scope coverage heat map
  • Award recommendation & rationale
When to Use   You've received sub bids and need to compare them.
G
Change Order
Generates fully priced change order packages with labor, material, and subcontractor breakdowns. Applies your markup structure, calculates schedule impact, and drafts a justification letter ready for owner submission.
What You Get
  • CO pricing with L/M/S breakdown
  • Markup & fee schedule applied
  • Schedule impact analysis
  • Justification letter (owner-ready)
  • Supporting documentation references
When to Use   A change happened on the job.
H
Payment Application
Builds your AIA G702/G703 Schedule of Values from your contract and tracks percent complete by line item. Outputs a payment application package ready for the owner's review and signature.
What You Get
  • AIA G702 / G703 formatted output
  • Schedule of Values builder
  • Percent complete tracking
  • Retainage calculations
When to Use   Monthly billing time.
I
RFI
Drafts Requests for Information with suggested resolutions, drawing and spec references, and a tracking log. Surfaces ambiguities, conflicts, and missing details so you can get answers before they become problems.
What You Get
  • Draft RFIs with suggested resolutions
  • Drawing & spec references per RFI
  • RFI tracking log
  • Priority / impact classification
When to Use   Something on the plans doesn't make sense.
J
Sub Pre-Qualification
Evaluates subcontractors against your qualification criteria and builds a database entry for each. Captures EMR, bonding capacity, insurance limits, and generates a composite risk rating so you know who belongs on your bid list.
What You Get
  • Database entry per sub
  • EMR, bonding & insurance review
  • Composite risk rating
  • Qualification summary card
When to Use   Evaluating a new subcontractor.
K
Design-Build
For design-build delivery where the contractor owns scope, pricing, and schedule under a single contract. Generates a conceptual layout, tiered pricing options, and a compressed schedule.
What You Get
  • Conceptual layout & approach
  • Tiered pricing options (budget / standard / premium)
  • Schedule compression analysis
  • Single-source delivery narrative
  • Risk allocation matrix
When to Use   Design-build delivery with single-source scope and pricing.
Ready?

Pick a Mode.
Win the Bid.

Book a call to see it in action, or log in to your client portal to get started.

BOOK A CALL CLIENT PORTAL
Important: Vernier's AI features are assistive tools only and do not constitute professional engineering, architectural, or construction services. All outputs must be independently reviewed by qualified licensed professionals. Performance claims are illustrative and based on typical user reports. Actual results vary. Full Terms of Service